NEWPRIOK PROJECT DEVELOPMENT

  • 2nd August 2014 GMT+7
Photos of the development of Kalibaru Port or called NewPriok Terminal in Tanjung Priok Port in North Jakarta, Saturday (2/8). The work of the NewPriok project Phase I Container Terminal 1 has reached 60 percent with as much as 6.860 psc piling has been installed from a total of 9.815 pcs and is expected to be operated at the end of 2014 (length of 400 m dock) while the overall Container Terminal 1 along 800 m will operate full in the mid quarter of 2015 with a 1.5 million TEUs tampung power capacity. ANTARA PHOTO/Andika Wahyu/nz/14.
Related photo
Standard
Image information
Image size
3000x1991
File size
2.13 MB
Created
02/08/2014 15:20 WIB
Photographer
Andika Wahyu
Editor