COMAL BRIDGE DESIGN POLE MOUNTING

  • 10th August 2014
A heavy tool completes the installation of piles in the Comal pantura line bridge, Crosser, Jateng, Sunday (10/8). To strengthen the durability of the bridge, as many as eight points of the piles are installed on the bottom of the bridge. ANTARA PHOTO/Oky Lukmansyah/s/nz/14
Related photo
Standard
Image information
Image size
2467x3700
File size
1.5 MB
Created
10/08/2014 14:40 WIB
Photographer
Oky Lukmansyah
Editor