COMAL BRIDGE DESIGN POLE MOUNTING
A heavy tool completes the installation of piles in the Comal pantura line bridge, Crosser, Jateng, Sunday (10/8). To strengthen the durability of the bridge, as many as eight points of the piles are installed on the bottom of the bridge. ANTARA PHOTO/Oky Lukmansyah/s/nz/14
Related photo