NORMALIZATION OF CISADANE RIVER

  • 12 Agustus 2014 18:45
A heavy tool conducts sedimentation dredging at the 10 River Cisadane water door, Tangerang, Tangerang, Banten, Tuesday (12/8). The Ministry of Public Works through the Directorate General of the Great Water Resources of the Ciliwung Cisadane River began to conduct the normalization of the Cisadane river along 21 KM with a total of 1,9 Triliun budget that was done until 2018. ANTARA PHOTO/Muhammad Iqbal/s/nz/14
Related photo
Standard
Image information
Image size
2160x3272
File size
1.4 MB
Created
12/08/2014 18:45 WIB
Photographer
Muhammad Iqbal
Editor