SOFT LAUNCHING INSTALLATION OF SIDOARJO FISH QUARANTINE

  • 3rd September 2014 GMT+7
Minister of Marine and Fishery Sharif C Sutardjo (second left), along the Governor of East Java, Soekarwo (second right), and Sidoarjo Bupati, H. Saifullah (right) the soft launching operations of the Fish Karantina Installation, Quality Control and Security of Fishery Results (KIPM) in Puspa Agro, Jemundo Village, Taman District, Sidoarjo, Jatim, Wednesday (3/9). Selected East Java Province as a KIPM Installation location, because this area has a very large contribution in making Indonesia as a state of forestry and fisheries in the world, with a contribution of 14,85 per cent to the National Gross Domestic Product (PDB), by accounting as much as 1,1 million tons of total fisheries production in 2012 which reached 15.26 million tons. ANTARA PHOTO/Hendra Sonie/EI/ed/mes/14
Related photo
Standard
Image information
Image size
4288x2848
File size
1.1 MB
Created
03/09/2014 17:30 WIB
Photographer
Hendra Sonie
Editor