SOLAR DIFFICULTY FISHING

  • 15th November 2014 GMT+7
Nelayan moved solar fuel to ship tanks during the preparation of melaut at the port of Lamplo, Banda Aceh, Aceh, Saturday (15/11). Nelayan who has a 30 GT size vessel has difficulty in fuel solar type because it is to squeeze for 10 days requiring solar as much as 6 tons while available only about 3 tons, and they also difficulty getting a letter recommendation to buy the BBM. ANTARA PHOTO/Ampelsa/s/Spt/14
Related photo
Standard
Image information
Image size
3000x2000
File size
1.46 MB
Created
15/11/2014 19:35 WIB
Photographer
Ampelsa
Editor