REPAIR DRAINAGE CANDI DRILLOBUDUR
Workers complete the drainage repair work (water channel) in the north hallway of Borobudur temple in the Complex of Borobudur Temple Tourism Park (TWCB) Magelang, Jateng, Monday(17/11). The drainage repair aims to smooth the drain of water inside the temple so that it does not bridge through the stone side that can result in the weather. ANTARA PHOTO/Anis Efizudin/s/pd/14
Related photo