BRIDGE REPLACEMENT DOLAGO
A number of vehicles across the replacement of Dolago Bridge that breaks due to the flooding of the city in 2012 and in Dolago, Paris Mautong, Central Sulawesi, Thursday (27/11). The bridge that became part of the Trans Sulawesi line swallows the budget of APBN 2013 Rp 45,7 billion has now been in the finising stage, namely the congestion. ANTARA PHOTO/Fiqman Sunandar/s/mes/14.
Related photo