SHIP SIMULATOR DEVELOPMENT

  • 29th November 2014 GMT+7
All continue the work of the development of the cruise simulator and Training of broadcasting Sciences (BP2IP) Tiram, Padangpariaman, Sumbar, Saturday (29/11). The similar building with the ship is one of the 30 units of the building in BP2IP which is working up to the next three years at the total cost of Rp1.5 trillion. ANTARA PHOTO/Iggoy el Fitra/ed/pd/14
Related photo
Standard
Image information
Image size
3000x1735
File size
1.11 MB
Created
29/11/2014 20:05 WIB
Photographer
Iggoy El Fitra
Editor