TARGET PRODUCTION GRANT 2015

  • 4th December 2014
Workers in the area of Bayur, Tangerang, Banten, Thursday (4/12). According to the farming data production of Giling Dry Valley (GKG) in 2015 is expected to touch the figure 73.4 million tons. To be able to achieve that target, the order has prepared support funds worth Rp 1.3 trillion. ANTARA PHOTO/Lucky R./Rei/nz/14.
Related photo
Standard
Image information
Image size
3872x2592
File size
1.91 MB
Created
04/12/2014 17:55 WIB
Photographer
Lucky. R
Editor