HYDRO MINI POWER PLANT

  • 9th December 2014 GMT+7
The officer checked the high discharge water from Kali Segara who headed the turbine space of the Mini Hydro Power Plant (PLTMH) Fresha in the Water Bend in Bentek Village, Gondang, North Lombok, NTB, Monday (8/12). This nuclear PLTMH has three units of plant turbines that have been operating and one unit in the construction process with a total installed capacity of seven MW to support the power resistance of PLN in the NTB region. ANTARA PHOTO/Widodo S. Jusuf/Rei/nz/14.
Related photo
Standard
Image information
Image size
3000x1997
File size
1.11 MB
Created
09/12/2014 10:25 WIB
Photographer
Widodo S. Jusuf
Editor