INDUSTRIAL GAS STABILIZATION

  • 12th February 2015
A workers check the gas pipeline metering device at PT Pertagas Niaga Station, Wunut, Sidoarjo Drive, Thursday (12/2). PT Dharma Pratama Sejati (DPS), guarantees the stable gas supply of 20 MMSCFD in the Ngoro Industrial Park (NIP) Mojokerto industrial area, through pipes sized up to 8 inchi and relying on the supply of the same working Contractor gas well (K3S) in Jatim region. ANTARA PHOTO/Eric Ireng/Rei/ama/15.
Related photo
Standard
Image information
Image size
6000x4000
File size
1.56 MB
Created
12/02/2015 16:10 WIB
Photographer
Eric Ireng
Editor