ELECTRICAL SPLICING PDKB SYSTEM

  • 9th March 2015 GMT+7
The workers connect the electrical network using the Connecting System In the Holding Procurement (PDKB) the Positive transmission line is 20.000VA in Sigi, Central Sulawesi, Monday (9/3). The PDKB system is used to minimize losses due to electrical outages due to the workmanship of electrical channels. ANTARA PHOTO/Basri Marzuki/Rei/pd/15.
Related photo
Standard
Image information
Image size
3500x2325
File size
1006.28 KB
Created
09/03/2015 14:30 WIB
Photographer
Basri Marzuki
Editor