ELECTRICAL SPLICING PDKB SYSTEM
The workers connect the electrical network using the Connecting System In the Holding Procurement (PDKB) the Positive transmission line is 20.000VA in Sigi, Central Sulawesi, Monday (9/3). The PDKB system is used to minimize losses due to electrical outages due to the workmanship of electrical channels. ANTARA PHOTO/Basri Marzuki/Rei/pd/15.
Related photo