FIRST POLE DESIGN PLTU JENNEPONTO II
Menko Maritim Indroyono Soesilo (right) talked with the Founder Bosowa Aksa Mahmud (left) and CEO Bosowa Erwin Aksa (mid) while witnessing the first pole of the PLTU Jeneponto Phase II in Jenneponto Regency, South Sulawesi, Thursday (19/3). Bosowa Energy will build Steam Power Plant (PLTU) with 2 x 125 Mega Watt capacities with Rp 3 trillion budget. ANTARA PHOTO/Yusran Uccang/mes/14
Related photo