CONSTRUCTION OF SCALED PORT

  • 23rd July 2015 GMT+7
Effectiveness in the development location of the port dock Ro-Ro (Roll On-Roll Off) Parit 7 Tungkal Hilir scaled at Tanjung Jabung Barat, Jambi, Thursday (23/7). The construction of ports in East Sumatra Beach is planned as a connecting means of the Indonesian marine economy activity with Malaysia, Singapore, and Thailand which began in 2003 was scaled since 2012 and due to the termination of APBN funds. ANTARA PHOTO/Wahdi Septiawan/s/aww/15.
Related photo
Standard
Image information
Image size
3000x1987
File size
1.9 MB
Created
23/07/2015 17:15 WIB
Photographer
Wahdi Septiawan
Editor