PRESIDENT OF PIERCING DAM RACKNAMO
President Joko Widodo runs out of the bow tunnel reviewing the construction of Raknamo dam in Kupang Regency, NTT, Saturday (25/7). The 147 hectares of 147 hectares will be expected to cope with various problems in NTT Province such as dryness, food and bad nutrition. ANTARA PHOTO/Kornelis Kaha/asf/foc/15.
Related photo