ELECTRIC PRODUCTION OF PLATA PLUG

  • 10th August 2015 GMT+7
The officer controls the operation of the turbine engine in the complex of Indonesia Power Sub Unit of Water Power Plant (PLTA) Jelok, Semarang District, Jateng, Monday (10/8). The last month during the dry, the Jelok PLTA experienced a decrease in electricity production of about 75 percent and only operates one of the four turbine machines. ANTARA PHOTO/Aditya Pradana Putra/Spt/15.
Related photo
Standard
Image information
Image size
3000x1820
File size
417.31 KB
Created
10/08/2015 16:30 WIB
Photographer
Aditya Pradana Putra
Editor