ELEVASI RESERVOIR WONOREJO

  • 10th August 2015 GMT+7
A number of tourists running above the construction of the Wonorejo dam, Tulungagung, East Java, Monday (10/8). The impact of the dryness and storms of elnino for the last three months leads to the elevation of reservoir water that has a maximum capacity of 122 million cubic meters experienced a decrease of about 7 meters from the previous 184 mdpl (meter above sea level) is now living 176.24 mdpl. ANTARA PHOTO/Destyan Sujarwoko/Zk/Spt/15
Related photo
Standard
Image information
Image size
3000x2000
File size
1.21 MB
Created
10/08/2015 19:00 WIB
Photographer
Destyan Sujarwoko
Editor