WASTE PROCESSING TO METANOL

  • 8th September 2015 GMT+7
Metanol gas separator installation pipe is installed above the garbage planting team at the end discharge place (TPA) Klotok, Kediri City, East Java, Tuesday (8/9). Local governments manage waste in the final disposal to Metanol fuel gas replacement elliptically utilized for a little 19 family heads. ANTARA PHOTO/Prasetia Fauzani/Zk/pd/15
Related photo
Standard
Image information
Image size
3888x2592
File size
1.45 MB
Created
08/09/2015 17:45 WIB
Photographer
Prasetia Fauzani/str
Editor