WASTE PROCESSING TO METANOL
Metanol gas separator installation pipe is installed above the garbage planting team at the end discharge place (TPA) Klotok, Kediri City, East Java, Tuesday (8/9). Local governments manage waste in the final disposal to Metanol fuel gas replacement elliptically utilized for a little 19 family heads. ANTARA PHOTO/Prasetia Fauzani/Zk/pd/15
Related photo