TANGGUL RIVER CALIMALANG
Workers operate heavy equipment when the construction of the Kalimalang river embankment in Jatimulya Area, Bekasi, West Java, Thursday (10/9). The development of river embankment is about 6 kilometers aimed at preventing flooding in the area. ANTARA PHOTO/Risky Andrianto/aww/15.
Related photo