NORMALIZATION OF RESERVOIR

  • 23rd October 2015 GMT+7
Heavy equipment performs sediment dredging in Dawuhan reservoir, Madiun Regency, East Java, Friday (23/10). An average two-meter average sediment to normalize the 5,425 million cubic meters of water and is able to characterize about 3,000 hectares of agricultural land. ANTARA PHOTO/Siswowidodo/nz/15
Related photo
Standard
Image information
Image size
3200x2128
File size
1.25 MB
Created
23/10/2015 13:05 WIB
Photographer
Siswowidodo
Editor