PLTU

  • 26th October 2015 GMT+7
The vehicle crosses next to the complex of Steam Power Generation (PLTU) Paiton, Probolinggo, East Java, Monday (26/10). PLTU Paiton operates 3 PLTU which strengthens the Java-Bali electricity system of 29.231 MW, while the peak load is 19.700 MW, so the surplus 9.531 MW. ANTARA PHOTO/Moch Asim/pd/15
Related photo
Standard
Image information
Image size
3000x1928
File size
1.25 MB
Created
26/10/2015 21:20 WIB
Photographer
Moch Asim
Editor