NEW BRIDGE CONSTRUCTION PROJECTS

  • 5th November 2015 GMT+7
Workers conduct drilling on the basis of Krueng Cut river, Regency, Aceh Besar, Aceh, Thursday (5/11). Drilling to measure the level of the river’s basic violence, is the early preparation of the new bridge development project to be built side by the old bridge to smooth the transportation flow. ANTARA PHOTO/Ampelsa/nz/15
Related photo
Standard
Image information
Image size
2000x3000
File size
2.07 MB
Created
05/11/2015 15:40 WIB
Photographer
Ampelsa
Editor