DESIGN BUILD N219

  • 12th November 2015 GMT+7
A number of technicians examined the N219 aircraft body in the event of SySize Reaching Phase Validation Engineering Design Build N219 Structure in hanggar PT Dirgantara Indonesia (DI), Bandung, West Java, Thursday (12/11). The 19 passenger-sized N219 aircraft has been completed by PT DI cooperation with LAPAN and is ready to be inaugurated by President Joko Widodo planned to fly premier in 2016. ANTARA PHOTO/Novrian Arbi/nz/15
Related photo
Standard
Image information
Image size
3000x1978
File size
814.2 KB
Created
12/11/2015 18:00 WIB
Photographer
Novrian Arbi
Editor