DEVELOPMENT OF WHITE RED BRIDGE

  • 4th December 2015 GMT+7
The workers are contemplated the end stage of the White Red Bridge in Ambon, Maluku, Friday (4/12). The targeted bridge was completed January 2016 it has a total length of 1.140 meters connecting the village of Galala, Sirimau District and Poka Village, Ambon Bay District, Ambon City. The height of this bridge reaches 34.1 meters above sea level. ANTARA PHOTO/izaac mulyawan/nz/15.
Related photo
Standard
Image information
Image size
3600x4800
File size
2.37 MB
Created
04/12/2015 18:00 WIB
Photographer
Izaac Mulyawan
Editor