POWER SUPPLY PUMP STATION

  • 10th December 2015 GMT+7
The officer checked the generator when being done the addition of the new electrical network by PLN at the Fish Market Water Pump Station, North Jakarta, Thursday (10/12). As the antissipation came the PLN rainy season made the strengthening of the electric supply backup system to a number of pump stations in North Jakarta by building a new network of 6.9 km with 170 poles thatse power source is supplied from Gardu Induk Muara Karang. ANTARA PHOTO/Sigid Kurniawan/foc/15.
Related photo
Standard
Image information
Image size
3000x2000
File size
1.53 MB
Created
10/12/2015 16:25 WIB
Photographer
Sigid Kurniawan
Editor