GEOTHERMAL POWER DRILLING
General Manager PT Medco Light Geothermal Wisnu Subroto (the left five) explains how to drilling to Deputy Bupati Bondowoso Salwa Arifin (the left three) when the initial drilling project of the Earth’s Hot Power Plant (PLTP) in Blawan Village, Sempol, Bondowoso, East Java, Tuesday (15/12). The drilling project with the Slim Hole technique in the two points is carried out to find out the amount of geothermal energy (Geothermal) that can generate 110 Megawatt energy. ANTARA PHOTO/Seno/kye/15.
Related photo