WHITE RED BRIDGE LOAD TEST

  • 3rd March 2016 GMT+7
A number of vehicles are preparing to follow the load test conducted by Bridge Security Commission and the Tunnel of the Ministry of Public Works in the White Red Bridge, Ambon, Maluku, Thursday (3/3). Testing is carried out against 1,06 kilometers of bridge to know the feasibility in holding loads, as a mandatory procedure is operated as public facilities. ANTARAFOTO/izaac mulyawan/aww/16.
Related photo
Standard
Image information
Image size
3600x4800
File size
2.39 MB
Created
03/03/2016 18:45 WIB
Photographer
Izaac Mulyawan
Editor