WHITE RED BRIDGE LOAD TEST

  • 3rd March 2016
The Governor of Maluku Said Assagaff (second from the right) witnessed the process of burden test conducted by the Bridge Security Commission and the Tunnel of the Ministry of Public Works in the White Red Bridge, Ambon, Maluku, Thursday (3/3). Testing is carried out against 1,06 kilometers of bridge to find out the feasibility in holding loads, as a mandatory procedure is operated as a public facility. ANTARAFOTO/izaac mulyawan/aww/16.
Related photo
Standard
Image information
Image size
4800x3200
File size
1.58 MB
Created
03/03/2016 19:25 WIB
Photographer
Izaac Mulyawan
Editor