DEMANDS OF ELECTRIC BRIDAL CORRUPTION DEIYAI

  • 10th March 2016 GMT+7
In the case of the development of the microhidro power plant in Deiyai Regency, Papua lrenius Adii (second right) and charged two Setiady Jusuf (right) runs out the trial space as a result undergoing an advanced hearing with the agenda of the reading of the demands by the General Opportunity (JPU) in the Tipikor court, Jakarta, Thursday (10/3). Two charged Irenius Adii and Setiady Jusuf was demanded by JPU with a three-year prison criminal and a penalty criminal of Rp100 million as well as a subsidair six months of prison. ANTARA PHOTO/M Agung Rajasa/foc/16.
Related photo
Standard
Image information
Image size
3000x2003
File size
1.38 MB
Created
10/03/2016 13:45 WIB
Photographer
M Agung Rajasa
Editor