SHIP REPAIR ABOVE 30 GT

  • 21st March 2016 GMT+7
A number of workers complete the ship repair over 30 Gross Tonnage (GT) at Tegal Port, Central Java, Monday (21/3). The repair of the body and the fishing boat engine above 30 GT takes six months at the cost of reaching Rp200 million. ANTARA PHOTO/Oky Lukmansyah/16
Related photo
Standard
Image information
Image size
3600x2391
File size
1.11 MB
Created
21/03/2016 20:40 WIB
Photographer
Oky Lukmansyah
Editor