CLOSURE OF PLTU ROD CONSTRUCTION AREA

  • 24th March 2016
A number of workers install panel fences (seng) at the construction site of Steam Power Generation (PLTU) Rods at the End of Negoro, Rods, Central Java, Thursday (24/3). The 226 hectares of land is the preparation of the construction of the 226 hectares of cooperation between the government and PT Bhimasena Power Indonesia (BPI) which is estimated to be completed in the Kuartal I 2020, with a local workforce of 6,000 people. ANTARA PHOTO/Aditya Pradana Putra/foc/16.
Related photo
Standard
Image information
Image size
3000x1950
File size
499.69 KB
Created
24/03/2016 18:05 WIB
Photographer
Aditya Pradana Putra
Editor