ELECTRIC INTERCONNECT BRICKM-BINTAN

  • 28th April 2016 GMT+7
Employees across Tanjung Kasam’s PLTU turbine, Batam, Riau Islands, Thursday (28/4). In addition to as the "baseload" (the basic load crusher) electricity in Batam, Tanjung Kasam PLTU which has a power capacity of 110 Mega Watt (MW) also supplys electrical requirements for Bintan District with a subsea cable interconnect network 150 kilo Volt (kV) along 4.450 meters. ANTARA PHOTO/M N Kanwa/ama/16.
Related photo
Standard
Image information
Image size
3000x2000
File size
1.33 MB
Created
28/04/2016 15:10 WIB
Photographer
M N Kanwa
Editor