TOLL LIGHTS READY FOR MUD FLOW

  • 20th June 2016
Tol Trans Sumatra Road (JTTS) deas Bakauhuni-Tbanggi Besar in South Lampung Village, Lampung, Monday (20/6). The 2016 wide ridge flow rate, two Toll Lampung Road locations can be utilized for wider mud services, located Lematang-Kota Baru throughout 3,99 kilometers (km), and Branti-Metro throughout 12,09 km. ANTARA PHOTO/Tommy Saputra/pd/16.
Related photo
Standard
Image information
Image size
4000x2664
File size
2.75 MB
Created
20/06/2016 18:50 WIB
Photographer
Tommy Saputra
Editor