MUD FLOW PORT BRAID
A number of two-wheel vehicles descending from ships at the Port of Ketapang, Banyuwangi, East Java, Friday (1/7). Entering H-5 The width of the mud flow from Bali Island through the port of Ketapang to Banyuwangi has crossed 44.959 people and is estimated to experience its peak at H-3 Lebaran. ANTARA PHOTO/ Budi Candra Setya/foc/16.
Related photo