PRODUCTION PLTA POSO 2

  • 16th August 2016 GMT+7
Workers conduct routine inspections above turbine crucifixed water pipes in the Power Plant area (PLTA) Poso Unit 2 in Poso, Central Sulawesi, Tuesday (16/8). The Poso 2 PLTA with a power capacity of 3 X 65 MW or 195 MW with investment value reaches Rp3.5 trillion is a nation's work plant that is one of the power supply for the Central Sulawesi region, South Sulawesi and Palu. ANTARA PHOTO/Muhammad Adimaja/foc/16.
Related photo
Standard
Image information
Image size
4080x2720
File size
1.23 MB
Created
16/08/2016 10:10 WIB
Photographer
Muhammad Adimaja
Editor