PREPARATION OF OPEN WATER POOL

  • 9th September 2016 GMT+7
The officer installed the guardrail for the open aquatic swimming pool at Tirtamaya Beach, Indramayu, West Java, Friday (9/9). The installation of the float as a practice preparation as well as the test of the arena for the branch of the open aquatic swimming pool. ANTARA PHOTO/Dedhez Budget/Spt/16.
Related photo
Standard
Image information
Image size
3200x2133
File size
1.24 MB
Created
09/09/2016 19:20 WIB
Photographer
Dedhez Anggara
Editor