WHEREDO BYPASS ROAD DEVELOPMENT

  • 11th November 2016 GMT+7
A number of vehicles across the layang road development location in Manado, North Sulawesi, Friday (11/11). The construction of Manado Bypass is a stacking sway that connects Manado’s Road, Sam Ratulangi Airport and Bitung Port has reached 75 percent and is expected to be completed in the end of this year. ANTARA PHOTO/Adwit B Pramono/aww/16.
Related photo
Standard
Image information
Image size
3000x1765
File size
2.29 MB
Created
11/11/2016 18:00 WIB
Photographer
Adwit B Pramono
Editor