CONSTRUCTION OF NGADILUWIH BRIDGE

  • 15th May 2017 GMT+7
The Minister of Public Works and Housing of People (PUPR) Basoeki Hadimoeljono (second left) along the Secretary of the Cabinet Pramono Anung Wibowo (second right) reviewing the construction location of the Ngadiluwih Bridge as the installation of the first draft pole, in Branggahan Village, Kediri, East Java, Monday (15/5). The construction of the bridge above the Brantas River with the value of the project above Rp1 trillion is targeted finished at the end of 2017. ANTARA PHOTO/Prasetia Fauzani/kye/17
Related photo
Standard
Image information
Image size
4000x2667
File size
1.57 MB
Created
15/05/2017 17:10 WIB
Photographer
Prasetia Fauzani
Editor