ACCELERATE THE CONSTRUCTION OF TOLL BAWEN-SALATIGA
Operators operate heavy equipment in the development of one of the Tol Bawen-Salatiga parts in Plainiri, Bawen, Semarang Regency, Central Java, Monday (5/6). According to PT Trans Marga Jateng (TMJ) as the operator, the construction of the toll along the 17,6 kilometers which were inspired by the first week of Ramadan due to the deras rain was currently required to be timely opened functionally serving the pillar at H-7 to H+7 Lebaran. ANTARA PHOTO/Aditya Pradana Putra/aww/17.
Related photo