ACCELERATE THE CONSTRUCTION OF TOLL BAWEN-SALATIGA

  • 5th June 2017
Operators operate heavy equipment in the development of one of the Tol Bawen-Salatiga parts in Plainiri, Bawen, Semarang Regency, Central Java, Monday (5/6). According to PT Trans Marga Jateng (TMJ) as the operator, the construction of the toll along the 17,6 kilometers which were inspired by the first week of Ramadan due to the deras rain was currently required to be timely opened functionally serving the pillar at H-7 to H+7 Lebaran. ANTARA PHOTO/Aditya Pradana Putra/aww/17.
Related photo
Standard
Image information
Image size
4000x2557
File size
2.62 MB
Created
05/06/2017 15:20 WIB
Photographer
Aditya Pradana Putra
Editor