HIGH TERBING TOLL PREPARATION

  • 18th June 2017 GMT+7
The rider on Medan-Tebing High toll road project location, in Deli Serdang, North Sumatra, Sunday (18/6). The toll road is planned to operate for the 2017 Lebaran mud flow on Monday (19/6), and it is expected to be able to cope with jams in the High Medan-Tebing cross road area. ANTARA PHOTO/Irsan Mulyadi/kye/17
Related photo
Standard
Image information
Image size
5472x3648
File size
1.16 MB
Created
18/06/2017 18:00 WIB
Photographer
Irsan Mulyadi
Editor