PLTGU SHOT LOROK CCPP BLOCK 3

  • 14th July 2017 GMT+7
President Director of PLN Sofyan Basir (mid) combined with Dirut Indonesia Power Sripeni Inten Cahyani (second left), CEO of Asia Pasific GE Gas Power System Venkat kannan (second right), SOO Power Business Division Marubeni Corporation Takashi Fujinaga (left) and Director of Operation Hutama Karya Suroto (right) signed the construction contract of Tambak Lorok Combined Cycle Power Plant (CCPP) Block 3 in Jakarta, Friday (14/7). The plant project that funded Rp4,8 trillion with the saving value of Rp581 billion it will play as "load follower" with a 780 Mega Watt (MW) capacity gas engine with a year's production assumption reaching 3.7 Giga Watt Hour (GWH) and was built as a form of contribution to implement 35,000 Mega Watt (MW government programs). ANTARA PHOTO/Akbar Nugroho Gumay/aww/17.
Related photo
Standard
Image information
Image size
4293x2883
File size
2.03 MB
Created
14/07/2017 18:50 WIB
Photographer
Akbar Nugroho Gumay
Editor