INCREASE PE PRODUCTION TWICE
President Director of PT Chandra Asri Petrochemical Tbk (CAP) Erwin Ciputra (second right) and Vice President Director Kulachet Dharachandra (right) was hand-ged together Director of Toyo Engineering Corporation Japan Tomohisa Abe (mid), President & CEO of Toyo Engineering Korea Limited Toru Osanai (second left) and President Director of PT Inti Karya Persada Tehnik (IKPT) Eiji Hosoi (left) as the signing of the new EPC Plant Polyethylene (PE) Contract, in Jakarta, Thursday (31/8). CAP targets a new PE Plant capacity of 400 KTA located in Cilegon, Banten, can start operating in 2020 as well as will increase the production of PE twice as early as 336 KTA to 736 KTA. ANTARA PHOTO/Audy Alwi/ama/17
Related photo