BPJT TOLL ROAD TOLL TEST TRANS SUMATERA

  • 18th September 2017 GMT+7
Toll Road Regulatory Team (BPJT) conducted a feasibility test on the toll road body of Medan-Binjai, North Sumatra, Monday (18/9). Guna accelerates the completion of the toll roads of Trans Sumatra in Sumut, BPJT conducts toll road feasibility checks ranging from road construction, bridges, vehicle traffic engineering and road geometry design to ground foundation before it is declared worth to operate. ANTARA PHOTO/Like Prime/ama/17
Related photo
Standard
Image information
Image size
4000x2667
File size
445.54 KB
Created
18/09/2017 17:30 WIB
Photographer
Septianda Perdana
Editor