FLY OVER TRIAL

  • 27th November 2017 GMT+7
The vehicle crosses the layang bridge (fly over) Saveg Surabaya, during the trial at Banda Aceh, Monday (27/11). The fly over trial was built together with the Beurawe underpass project with a budget of Rp250 billion was held up to 30 November and was planned to be inaugurated President Joko Widodo in early December 2017. ANTARA PHOTO/Irwansyah Putra/foc/17.
Related photo
Standard
Image information
Image size
5218x3479
File size
2.77 MB
Created
27/11/2017 11:20 WIB
Photographer
Irwansyah Putra
Editor