MEGA DAM PROJECT

  • 8th April 2018 GMT+7
Workers are preparing for the construction of Ladongi Bends located in the Atula Village, Ladongi, East Kolaka, Southeast Sulawesi, Saturday (7/4). The magnificent development of the APBN sourced by Rp 844 billion was planned to flow the rice fields of 3600 hectares as well as for water power plants with a power of about 1.5 MW. ANTARA PHOTO/Jojon/foc/18.
Related photo
Standard
Image information
Image size
2816x1880
File size
1016.44 KB
Created
08/04/2018 20:25 WIB
Photographer
Jojon
Editor