ACTION OF PLTU DRAWBACK

  • 17th April 2018 GMT+7
A number of fishermen conducts the practice of the development of PLTU Celukan Bawang when the ship Greenpeace, Rainbow Warrior, crossing in the water of Celukan Bawang, Buleleng, Bali, Tuesday (17/4). Locals reject the plan for the development of Celukan Bawang’s 2x330 MW-based Celukan PLTU because the impact of pollution interferes with health, damaging farmland and eliminates fishermen access to search for fish in the aquatic area. ANTARA PHOTO/Wira Suryantala/pd/18.
Related photo
Standard
Image information
Image size
4000x2674
File size
1.67 MB
Created
17/04/2018 19:45 WIB
Photographer
Wira Suryantala
Editor