GIRDER BRIDGE TOL GRINGSING
A number of active workers when mounting the 'girder' beam in Pantura Bridge Toll Gringsing, Rod Regency, Central Java, Wednesday (18/4). PT. Semarang Toll Road (BSTR) rods install 12 'girder' with a length of 5.8 meters and the weight of each about 130 tons with an estimated installation time of about 100 minutes per beam for about 3-5 days, in order toll trans Java can be passed to the next Lebaran mudik. ANTARA PHOTO/Harviyan Prime Putra/ama/18
Related photo