WASTE POWER GENERATION PROJECT

  • 25th May 2018 GMT+7
Geomembrane disposal that closes the trash surface in the construction project of Garbage Power Plant (PLTSa) methane gas, at the end disposal (TPA) Jatikara, Semarang, Central Java, Friday (25/5). The 9-hectare PLTSa project occupies an estimated 9-hectare electricity to generate 0.8 megawatts targeted to be completed in October 2018. ANTARA PHOTO/R. Rekotomo/ama/18.
Related photo
Standard
Image information
Image size
4000x2520
File size
3.13 MB
Created
25/05/2018 13:30 WIB
Photographer
R. Rekotomo
Editor