WASTE POWER GENERATION PROJECT
Geomembrane disposal that closes the trash surface in the construction project of Garbage Power Plant (PLTSa) methane gas, at the end disposal (TPA) Jatikara, Semarang, Central Java, Friday (25/5). The 9-hectare PLTSa project occupies an estimated 9-hectare electricity to generate 0.8 megawatts targeted to be completed in October 2018. ANTARA PHOTO/R. Rekotomo/ama/18.
Related photo