TOL FUNCTIONAL SOLO-NGAWI OPENED

  • 8th June 2018
A number of constraints entering the Gardu Gate Tol Colomadu, Karanganyar, Central Java, Friday (8/6). The 90 km Solo-Ngawi Toll Line opened two-way and began to be operated for the mud flow functional toll path and back Lebaran 2018 for free 24 hours full. ANTARA PHOTO/Mohammad Ayudha/kye/18.
Related photo
Standard
Image information
Image size
4000x2667
File size
2.73 MB
Created
08/06/2018 17:35 WIB
Photographer
Mohammad Ayudha
Editor